At a glance
- Bedroom windows are one part of a complete secondary-suite permit and life-safety plan.
- Confirm the suite layout and permit requirements before cutting a foundation opening.
- Application drawings should clearly show bedroom-window locations, styles, opening dimensions and wells.
Related Edmonton guides
Treat windows as part of the full suite plan
Egress, fire separation, heating, ventilation, exits and other code items interact. Confirm the complete design before cutting openings.
Show usable dimensions
Application drawings should identify window locations, dimensions and styles so reviewers can assess the proposed bedrooms.
Plan the bedroom window with the full suite
A legal secondary suite involves more than enlarging bedroom windows. The design may need to coordinate fire separations, smoke and carbon-monoxide alarms, heating and ventilation, exits, ceiling heights, plumbing, electrical work, parking or other municipal requirements. A window location that works in isolation can conflict with an exterior stair, deck, property line, exhaust vent or the approved interior layout.
Prepare the proposed floor plan first, identify every sleeping room and confirm which windows are intended as emergency escape openings. Then coordinate the exterior elevation, finished grade, window wells and any structural details before ordering windows.
What the window information should demonstrate
The drawings and product information should make the escape route easy to assess. Show the window style, clear opening, sill and well conditions rather than relying on a nominal frame size. If the well is deep or the sill is high, discuss usable access with the permit reviewer before construction.
- Room name and intended use.
- Window location and nominal unit dimensions.
- Manufacturer net-clear-opening width, height and area.
- Interior sill height and any proposed built-in access.
- Well projection, depth, cover and operating clearance.
- Relationship to stairs, decks, property lines and exterior equipment.
Avoid sequencing problems
Do not treat the windows as an early standalone job if the suite design is still changing. Permit review may affect bedroom boundaries, exterior openings or the route to an exit. Coordinating the drawings first reduces the risk of installing a window that does not match the final approved suite.
Useful next steps for this project
Detailed guides
Explore this topic
Frequently asked questions
Does an egress window make a basement suite legal?
No. Bedroom egress is only one part of the complete suite requirements and permit process.
Does every room in the suite need an egress window?
The bedroom escape requirement applies to sleeping rooms unless an applicable exception exists. Other rooms can have separate light, ventilation and building requirements.
Should the suite contractor or window contractor handle permits?
Either arrangement can work, but one written scope should identify who coordinates the complete suite drawings, window details, inspections and corrections.
Sources and further reading
- City of Edmonton — Secondary Suites
- City of Edmonton — House Permit Application Requirements
- City of Edmonton — Egress from Bedrooms
Reviewed September 2026. Building requirements, permit processes and costs can change; confirm current details for your property before construction.