Installation guide

Window Well Installation in Edmonton

A proper installation coordinates excavation, fastening, depth, drainage, grading and the usable escape space. Use the planning tool to turn site measurements into a clearer contractor scope.

Get a window well quote

At a glance

  • The well should hold soil back, preserve window operation and direct surface water away from the opening.
  • Edmonton’s minimum well-rim height depends on the grading stage: 50 mm above adjacent final grade or 150 mm above adjacent rough grade.
  • An egress well needs enough projection for the required escape clearance and the fully opened sash.

Original planning tool

Build a window-well quote brief

Record the four details most likely to expose a scope gap. This is a preliminary conversation aid, not a code or permit decision.

Record the clear space in front of the fully open window.

Record how far the well rim will sit above adjacent final grade.

Drain destination is not confirmed; make verification part of the written scope.

Do not excavate until all utility responses are received and the work area is cleared.

Measure the finished condition. Confirm current requirements with the City of Edmonton and qualified project professionals before construction.

Related Edmonton guides

Build around the finished grade

The top of the well should manage surface water while providing enough depth below the sill. The surrounding soil should direct water away from the foundation.

Coordinate with the window

Confirm the operable sash can open fully without hitting the well, cover or ladder.

Size the well around the window and the escape path

Measure the proposed window, not only the existing metal well. The well must be wide enough to expose the full opening and project far enough that the sash can operate. Alberta guidance calls for 760 mm clear space in front of a designated escape window; an outward-opening awning needs that clearance beyond the open sash.

A deeper well may need permanent steps or a ladder under the applicable design. Any access feature should not reduce the required clear space or prevent the window from opening.

Set the rim height for the right grading stage

Ask the installer to mark the planned final grade beside the well before ordering it. Edmonton’s Residential Lot Grading Guidelines set different minimums for rough grade and final grade. If landscaping, a patio or a raised bed will change the surface height, check the rim again against the finished surface.

The City also distinguishes slope by surface. Its grading table lists 5% away from a foundation wall for 2 m across soft landscaping and 1% for hard, impermeable surfaces. If a narrow side yard cannot accommodate that distance, ask the installer to show how the surface will fall into a drainage swale and where the water will go.

When you measureMinimum rim height above adjacent gradeWhat to ask for in the quote
Rough grade150 mmShow the rough-grade reference and the planned finished surface on the same sketch.
Final grade50 mmMark the finished surface beside the well and show how water will flow away from the foundation.

For example, a rim that sits 150 mm above rough grade would sit just 40 mm above final grade if the finished surface rises 110 mm beside it. That is 10 mm below the City’s final-grade minimum. Ask how the installer will adjust the rim or grading and who will remeasure it after landscaping.

Build a drainage path, not a decorative gravel bowl

Loose gravel helps water move within the well, but gravel alone does not guarantee drainage. Edmonton guidance explains that water entering a well should reach a drain tile connected to the foundation drainage system. Federal building-envelope research recommends a protected vertical drain connection over the foundation drain where that system is used.

The contractor should verify the intended destination rather than inserting a pipe and assuming it works. Older houses, altered systems and blocked weeping tile may need investigation or an alternative designed solution.

  • Drain location and confirmed discharge route.
  • Filter protection against fine soil entering perforated pipe.
  • Clean granular material below the window sill.
  • Sealed well-to-foundation interface.
  • Enough vertical separation between gravel and the window opening.

What a good installation scope includes

A complete scope identifies excavation limits, well material and gauge, fastening method, drainage, backfill, compaction and grade restoration. It should also state whether a cover, guard or escape access is included and how landscaping will be restored.

  • Well dimensions shown in the quote.
  • Fasteners and corrosion-resistant materials suitable for the foundation.
  • Waterproofing or seal details at penetrations.
  • Drain test or documented drainage destination.
  • Photos before backfill hides the work.
  • Maintenance instructions for the homeowner.

Clear the excavation before work starts

A window-well installation disturbs soil beside the foundation, so the excavation area needs utility clearance before digging. Utility Safety Partners says a routine request requires at least three full working days for facility owners to respond, and work must wait until every affected owner has either provided marks, information or a clearance.

A public locate request does not identify every private line. Irrigation, private electrical or communications runs, and homeowner-owned water or sewer services may require separate investigation. The written scope should identify who requests locates, who reviews every response and how conflicts will change the excavation plan.

  • Draw the locate-request work area large enough for excavation, spoil and equipment access.
  • Keep the current locate documentation and markings available during the work.
  • Confirm whether private irrigation, lighting or outbuilding services cross the area.
  • Do not treat a locate mark as a depth measurement; follow the utility owner's instructions for exposure.

Use four inspection hold points

The most important details disappear as the excavation is backfilled. Add four hold points to the quote so the homeowner can receive measurements and photos while each condition is still visible.

Hold pointRecordWhy it matters
Before excavationWindow operation, proposed well outline, final-grade reference and locate responsesConfirms the opening, finished dimensions and safe work area before soil is disturbed.
Before fasteningFoundation condition, window perimeter and attachment layoutExposes cracks, gaps or weak attachment areas before the well hides them.
Before backfillDrain material, inlet, destination, well fasteners and waterproofing detailsPreserves evidence of drainage and concealed work that cannot be checked later.
At handoffOpen-sash clearance, rim height, restored slope and a water-management walkthroughConfirms the finished well still works with the window, grade and intended escape path.

Photos document what was installed; they do not replace required inspections, testing or professional responsibility.

Useful next steps for this project

Frequently asked questions

Does every below-grade window need a well?

A well is generally considered when the bottom of the frame is at or near grade and proper grading cannot otherwise be maintained. The site-specific design and permit requirements control.

Does a clear plastic cover replace a drain?

No. A cover may reduce precipitation and debris, but wind-driven rain, snowmelt and surface runoff can still enter. The grading and drainage system must work without relying entirely on the cover.

How far below the window should the gravel be?

The City’s homeowner guide places the well bottom at least 12 inches below the sill and the top of the gravel 3 to 6 inches below it. Ask the installer to show both heights and identify where water goes after it passes through the gravel.

When should the utility locate be requested?

Utility Safety Partners calls for at least three full working days before routine ground disturbance, but response time can vary. Do not excavate until every notified utility has responded and the applicable locate documents remain valid.

Sources and further reading

City lot-grading and homeowner drainage guidance checked November 13, 2026. Building requirements, permit processes and costs can change; confirm current details for your property before construction.